docs(6/21-6/24): 系统复审 + 全升级规划 + TestClient 覆盖报告
新增文档:
- reports/STRICT_SYSTEM_REVIEW_2026-06-23.md (滚动严格复审过程稿)
- reports/STRICT_SYSTEM_REVIEW_2026-06-24.md (汇总版, 149 passed)
- reports/TEST_CLIENT_COVERAGE_2026-06-23.md (主链路真实 TestClient 覆盖收口)
- docs/plans/2026-06-23-full-upgrade-optimization-plan.md (全升级优化计划)
- docs/COMPETITOR_SCREEN_ANALYSIS_WENXIN_QIANWEN_2026-06-21.md (竞品分析)
- docs/FIELD_MAPPING_AUDIT_FIRST_PROFILE_2026-06-21.md (首版字段映射审计)
- docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md (页面重设计清单)
- docs/REPORT_PROFILE_VERSION_RELATION_2026-06-22.md (报告版本关系)
- docs/P0_EXECUTION_TASK_BREAKDOWN_2026-06-22.md (P0 任务拆解)
- docs/P0_MINIMAL_API_CHANGES_2026-06-22.md (P0 最小 API 改动)
- docs/UPGRADE_EXECUTION_BOARD_2026-06-22.md (升级执行板)
- product/PRD_UPGRADE_2026-06-21.md (PRD 升级版)

CHANGELOG.md 同步本轮 commits
2026-06-25 09:28:23 +08:00

15 KiB
Raw Blame History

UPGRADE_EXECUTION_BOARD_2026-06-22

最后更新: 2026-06-22 状态词: 用户侧升级规划执行板 真相源: product/PRD_UPGRADE_2026-06-21.md 配套文档:

  • docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md
  • docs/FIELD_MAPPING_AUDIT_FIRST_PROFILE_2026-06-21.md
  • docs/CURRENT_STATE.md
  • docs/ACTIVE_EXECUTION_BOARD_2026-06-20.md

本文件定义的是用户侧升级执行顺序与交付切线,不替代当前生产 readiness 执行板。


1. 当前执行结论

结论:

  • 用户侧升级路线已明确收敛为“审核优先 + Step 1 最小建档 + 审核结果分流 + 后续决策增强
  • 本轮 P0 只负责让默认主线成立,不追求一次性完成完整档案、完整内容中心或完整资产化
  • 当前生产 readiness 问题仍由 docs/ACTIVE_EXECUTION_BOARD_2026-06-20.md 管理;本执行板不覆盖真实支付 acceptance、自动交付主链、正式法务审定、异机恢复等门禁任务

本执行板的唯一目标是:

在不夸大现有能力、不混入生产门禁问题的前提下,把用户侧升级拆成可执行、可验收、可逐步落地的 P0 / P1 / P2 任务板。


2. 全局执行原则

2.1 默认主线原则

统一主线:

  1. 首页
  2. 先审核现有志愿方案 / 现有想法
  3. 根据审核结果决定:
    • 进入冲稳保微调
    • 补充 Step 1 或后续档案
    • 进入完整规划 / 报告
  4. 最终结合政策中心与同分段参考完成决策

禁止滑回:

  • 先完整建档再开始服务
  • 默认直接生成全新志愿方案
  • 让 Step 2-4 偏好字段阻塞审核入口

2.2 分期原则

P0先让审核优先主线成立

必须交付:

  • 首页任务化 + 审核主 CTA 前置
  • 审核页最小闭环
  • Step 1 最小建档
  • 审核结果分流

P1再做决策与内容增强

增强交付:

  • 冲稳保一级化
  • Step 2-4 偏好建档
  • 报告重组与资产外显
  • 政策中心
  • 同分段参考
  • 内容可信度展示规则

P2最后做深层增强

增强交付:

  • 深层偏好增强
  • 性格 / 兴趣测评联动
  • 多版本方案管理

2.3 口径边界原则

禁止表述:

  • “已完成完整 Web 自助 SaaS”
  • “已完成全国统一高置信同分段参考 / 政策中心”
  • “审核优先升级已替代生产 readiness 收口”
  • “报告资产化已包含完整版本体系”

允许表述:

  • “P0 审核优先主线已成立”
  • “P1 冲稳保 / 政策 / 同分段参考处于增强阶段”
  • “当前升级板与生产 readiness 执行板并行,各自管理不同问题域”

3. P0 执行板(当前最优先)

P0-1 首页任务化 + 审核主 CTA 前置

  • Owner: product / design / frontend
  • 优先级: P0
  • 状态: completed2026-06-23 第三轮质量收敛完成;首页主 CTA / 工作台主动作 / 最近复核入口已本地验证)
  • 目标:
    • 首页从落地 / 下单入口切为高考志愿工作台
    • 主 CTA 固定为“先审核现有志愿方案”
    • 用户进入首页后可快速理解当前阶段、下一步动作、审核优先主线
  • 输入依赖:
    • product/PRD_UPGRADE_2026-06-21.md §7.1 / §8.1
    • docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md §3
  • 交付物:
    • 首页结构说明
    • 首页组件清单
    • 首页主 / 次 / 弱 CTA 文案
  • 验收:
    • 首屏必须有 Banner、任务清单、主 CTA、次 CTA、最近审核结果 / 报告入口
    • 未建档用户可直接进入审核页
    • 首页不得把完整规划 / 生成方案作为默认第一主动作

P0-2 审核页最小闭环

  • Owner: product / backend / frontend
  • 优先级: P0
  • 状态: completed2026-06-23 第三轮质量收敛完成;审核页已补齐输入区 / 最小约束区 / 结果区 / 分流区)
  • 目标:
    • 审核页支持输入现有方案 / 现有想法
    • 审核页只要求最小约束信息:省份、科目组合、分数 / 位次
    • 审核后输出风险摘要与下一步建议
  • 输入依赖:
    • product/PRD_UPGRADE_2026-06-21.md §8.1 F-P0-2
    • docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md §4
    • docs/FIELD_MAPPING_AUDIT_FIRST_PROFILE_2026-06-21.md §5
  • 数据依赖:
    • existing_plan_summary
    • candidate_province
    • candidate_subjects
    • candidate_score
    • candidate_rank
  • 交付物:
    • 审核输入结构定义
    • 审核页状态机
    • 审核输出摘要结构
  • 验收:
    • 审核提交时不要求 Step 2-4 完整档案
    • 页面必须有输入区、最小约束区、结果区、分流区
    • 审核结果不能停在孤立结果页

P0-3 Step 1 最小建档

  • Owner: product / backend / frontend
  • 优先级: P0
  • 状态: completed2026-06-23 第三轮质量收敛完成Step 1 四字段保存 / 回填 / 最小完成态已本地验证)
  • 目标:
    • 只落 Step 1省份、科目组合、分数、位次
    • 支持保存草稿、回填、复用
    • 明确“未填完整档案也可先审核”
  • 输入依赖:
    • product/PRD_UPGRADE_2026-06-21.md §7.2 / §8.1 F-P0-3
    • docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md §5
    • docs/FIELD_MAPPING_AUDIT_FIRST_PROFILE_2026-06-21.md §3 / §5
  • 数据依赖:
    • profile_minimum_complete
    • Step 1 四字段回填语义
  • 交付物:
    • Step 1 表单定义
    • Step 1 保存 / 回填规则
    • 最小完成状态定义
  • 验收:
    • Step 1 可独立保存
    • 保存后可在审核页和报告页复用
    • Step 2-4 未完成不影响审核提交

P0-4 审核结果分流

  • Owner: product / frontend / analytics
  • 优先级: P0
  • 状态: completed2026-06-23 第三轮质量收敛完成;三条分流路径与 followup action 已可记录 / 回放)
  • 目标:
    • 审核结果页显式导向三类动作:冲稳保、补档案、完整规划 / 报告
    • 三类动作均可追踪
  • 输入依赖:
    • product/PRD_UPGRADE_2026-06-21.md §8.1 F-P0-4
    • docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md §4 / §10
    • docs/FIELD_MAPPING_AUDIT_FIRST_PROFILE_2026-06-21.md §5.3
  • 数据依赖:
    • review_entry_source
    • review_followup_action
  • 交付物:
    • 审核结果页结构
    • 分流动作枚举
    • 埋点字段定义
  • 验收:
    • 至少有一个默认推荐动作
    • 三条分流路径都可实际进入对应页面
    • 分流动作可被状态或埋点记录

P0-5 P0 验收门槛

  • Owner: product / tech-lead
  • 优先级: P0
  • 状态: completed2026-06-23 本地验证)
  • 验收结论成立条件:
    1. 首页默认主入口已切为审核
    2. 审核入口可在未完整建档状态下工作
    3. Step 1 可保存并回填
    4. 审核结果可进入至少一条后续动作,且三条路径均存在
    5. 对外口径未误写为“完整 SaaS 已完成”
    6. 验证: ./.venv/bin/python -m pytest -q admin/tests/test_web_public.py admin/tests/test_web_public_content_pages.py admin/tests/test_web_public_portal_info.py admin/tests/test_web_public_review_flow.py data/orders/tests/test_schema.py70 passed

4. P1 执行板P0 稳定后推进)

P1-1 冲稳保一级化

  • Owner: product / design / frontend
  • 优先级: P1
  • 状态: completed2026-06-23审核后可直接进入冲稳保视图冲 / 稳 / 保已作为一级分栏呈现)
  • 目标:
    • 把冲稳保从报告标签升级为一级入口与一级决策框架
  • 输入依赖:
    • product/PRD_UPGRADE_2026-06-21.md §8.2 F-P1-1
    • docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md §6
  • 验收:
    • 冲 / 稳 / 保必须是一级切换或一级分栏
    • 审核结果页可直接进入冲稳保视图

P1-2 Step 2-4 偏好建档

  • Owner: product / backend / frontend
  • 优先级: P1
  • 状态: completed2026-06-23Step 2-4 字段命名与映射表一致,且不阻塞审核入口)
  • 目标:
    • 落院校偏好、专业偏好、其他偏好三层建档
    • 统一字段命名、字段归属、文案语义
  • 输入依赖:
    • product/PRD_UPGRADE_2026-06-21.md §7.2 / §8.2 F-P1-2
    • docs/FIELD_MAPPING_AUDIT_FIRST_PROFILE_2026-06-21.md §6 / §7 / §10
  • 验收:
    • 新字段命名与映射表一致
    • Step 2-4 不阻塞审核入口

P1-3 报告重组与资产外显

  • Owner: product / backend / frontend
  • 优先级: P1
  • 状态: completed2026-06-23报告页已外显版本 / 最新性 / 下一步动作,并写入轻量 report_versions
  • 目标:
    • 报告页重组为结论摘要、风险、冲稳保、下一步动作的资产页
    • 显式外显版本、时间、基于哪个档案
  • 输入依赖:
    • product/PRD_UPGRADE_2026-06-21.md §7.3 / §8.2 F-P1-5 / §10.4
    • docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md §7
  • 数据依赖:
    • profile_version
    • review_result_version
    • report_version
  • 验收:
    • 报告页必须展示版本与下一步动作
    • 用户可判断报告是否基于最新档案生成

P1-4 政策中心

  • Owner: product / content / frontend
  • 优先级: P1
  • 状态: completed2026-06-23政策中心已展示来源 / 更新时间 / 适用省份,并提供辅助入口)
  • 目标:
    • 按省提供政策摘要、时间节点、批次规则、选科要求、误区说明
  • 输入依赖:
    • product/PRD_UPGRADE_2026-06-21.md §8.2 F-P1-4 / F-P1-6
    • docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md §8
  • 验收:
    • 页面必须展示来源、更新时间、适用省份
    • 未覆盖内容必须显式标注

P1-5 同分段参考

  • Owner: product / data / frontend
  • 优先级: P1
  • 状态: completed2026-06-23同分段参考已展示学校 / 专业 / 城市 / 扎堆提示与置信边界)
  • 目标:
    • 提供同分段学校 / 专业 / 城市参考与扎堆提示
  • 输入依赖:
    • product/PRD_UPGRADE_2026-06-21.md §8.2 F-P1-3 / F-P1-6
    • docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md §9
    • docs/ACTIVE_EXECUTION_BOARD_2026-06-20.md Q-A 数据边界
  • 验收:
    • 页面必须展示数据说明与置信等级说明
    • 非高置信数据不得使用强推荐口吻

P1-6 内容可信度规则落地

  • Owner: product / content / legal-review
  • 优先级: P1
  • 状态: completed2026-06-23政策中心 / 同分段参考已共用统一信任条并保留非高置信边界)
  • 目标:
    • 把政策中心 / 同分段参考的来源、更新时间、适用范围、置信等级规则写成统一组件与文案规范
  • 依赖:
    • product/PRD_UPGRADE_2026-06-21.md §8.2 F-P1-6
  • 验收:
    • 页面级文案不再出现“全国统一高置信完整能力”误导表达

P1-7 P1 验收门槛

  • Owner: product / tech-lead
  • 优先级: P1
  • 状态: completed2026-06-23 本地验证)
  • 验收结论成立条件:
    1. 冲稳保成为一级能力
    2. Step 2-4 字段与映射表一致
    3. 报告页完成资产化基础外显
    4. 政策中心 / 同分段参考具备清晰可信度边界
    5. 未对外夸大 27 省能力与政策完整性
    6. 验证: ./.venv/bin/python -m pytest -q admin/tests/test_web_public_content_pages.py admin/tests/test_web_public_portal_info.py admin/tests/test_web_public_review_flow.py data/orders/tests/test_schema.py60 passed

5. P2 执行板(增强层)

P2-1 深层偏好增强

  • Owner: product / backend / frontend
  • 优先级: P2
  • 状态: completed2026-06-23family_background / industry_resources / employment_region_preferences / graduation_plan 已稳定落在 intake
  • 目标:
    • 增强家庭背景、行业资源、就业地域偏好、毕业规划等深层字段
  • 依赖:
    • P1 字段语义稳定
  • 验收:
    • 字段用途明确
    • 默认非强制
    • 不制造隐私压迫感

P2-2 性格 / 兴趣测评联动

  • Owner: product / algorithm / frontend
  • 优先级: P2
  • 状态: completed2026-06-23MBTI / 霍兰德等结果已进入辅助判断因子区块,且文案锁定“只作辅助”)
  • 目标:
    • 将 MBTI / 霍兰德等结果作为辅助因子接入
  • 依赖:
    • P1 路径稳定
  • 验收:
    • 测评结果只作辅助,不作唯一判断

P2-3 多版本方案管理

  • Owner: backend / frontend / product
  • 优先级: P2
  • 状态: completed2026-06-23profile_versions / report_versions 已支持初始 / 查分后 / 正式填报前阶段区分)
  • 目标:
    • 支持初始档案方案、查分后校准方案、正式填报前调整方案管理
  • 依赖:
    • profile_version / review_result_version / report_version 语义已稳定
  • 验收:
    • 用户能区分不同阶段的方案版本
    • 版本关系不与报告版本语义冲突

P2-4 P2 验收门槛

  • Owner: product / tech-lead
  • 优先级: P2
  • 状态: completed2026-06-23 本地验证)
  • 验收结论成立条件:
    1. 深层偏好字段已稳定
    2. 测评联动不破坏主路径
    3. 多版本方案不与报告 / 档案版本语义冲突
    4. 验证: ./.venv/bin/python -m pytest -q admin/tests/test_web_public_content_pages.py admin/tests/test_web_public_portal_info.py admin/tests/test_web_public_review_flow.py data/orders/tests/test_schema.py60 passed

6. 与生产 readiness 执行板的边界

本执行板不覆盖以下事项:

  • T12-A 真实支付 acceptance
  • T12-B info_submitted -> serving 自动主链
  • T12-D retention cleanup 生产化部署验收
  • L-A 正式法务审定
  • L-B 异机备份恢复演练
  • Q-A 非湖南省份高置信数据密度深化

这些任务继续由:

  • docs/ACTIVE_EXECUTION_BOARD_2026-06-20.md

负责管理。

本执行板与生产 readiness 执行板的关系是:

  • 生产 readiness 板管“现有系统上线门禁与真实能力收口”
  • 升级执行板管“用户侧体验升级顺序与验收切线”

两者并行,但不能混写、不能互相替代


7. 当前推荐执行顺序

第一阶段

  1. P0-1 首页任务化 + 审核主 CTA 前置
  2. P0-2 审核页最小闭环
  3. P0-3 Step 1 最小建档
  4. P0-4 审核结果分流
  5. P0-5 P0 验收门槛核定

第二阶段

  1. P1-1 冲稳保一级化
  2. P1-2 Step 2-4 偏好建档
  3. P1-3 报告重组与资产外显
  4. P1-4 政策中心
  5. P1-5 同分段参考
  6. P1-6 内容可信度规则落地
  7. P1-7 P1 验收门槛核定

第三阶段

  1. P2-1 深层偏好增强
  2. P2-2 性格 / 兴趣测评联动
  3. P2-3 多版本方案管理
  4. P2-4 P2 验收门槛核定

8. 当前推荐读取顺序

  1. product/PRD_UPGRADE_2026-06-21.md
  2. docs/PAGE_REDESIGN_CHECKLIST_2026-06-21.md
  3. docs/FIELD_MAPPING_AUDIT_FIRST_PROFILE_2026-06-21.md
  4. docs/UPGRADE_EXECUTION_BOARD_2026-06-22.md(本文件)
  5. docs/CURRENT_STATE.md
  6. docs/ACTIVE_EXECUTION_BOARD_2026-06-20.md

9. 下一步执行建议

最优先:

  1. 先把 P0-1 ~ P0-4 各自拆成页面 / 接口 / 状态 / 埋点四类子任务
  2. 输出最小接口变更清单,确认 Step 1、审核输入、审核结果分流的数据承接方式
  3. 在 P0 验收通过前,不提前拉长到完整政策中心、完整同分段参考或多版本方案管理

原因:

  • 当前最大风险不是缺想法,而是范围失控
  • P0 的唯一目标是让“审核优先”真正成立
  • 只有 P0 成立后P1 的冲稳保 / 内容中心 / 资产化才有稳定承接面